Procure-to-Pay, PO Workflows & Spend Governance3 min readUpdated September 2026

Airbase vs Procurify for Commercial Solar and Energy EPC Firms

For a commercial solar or energy EPC firm, Procurify's purchase-order workflow gives better visibility into committed spend, while Airbase suits leaner teams running fewer projects. Equipment is ordered months before the interconnection date is known, so a schedule slip ties up capital before anyone sees it.

Airbase and Procurify take different approaches to that visibility, and the right pick depends on how many concurrent projects you're running and how much your finance team needs to see committed spend before it hits the books.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Committed spend versus actual spend, by project stage

Development-stage costs, interconnection studies, permitting fees, site assessments, are low dollar and predictable. Procurement-stage costs, modules, inverters, racking, switchgear, are the opposite: high dollar, ordered against a schedule, and often placed before the project has a firm notice to proceed. Construction-stage costs are labor and materials that need to track against the estimate. Procurify's purchase order structure is built for exactly this kind of staged commitment, letting you see what's been ordered but not yet received or billed, which matters when a project's interconnection date moves and you need to know your exposure. Airbase handles the approval workflow well but leans more on bill-pay after the fact than on tracking open commitments before an invoice arrives.

When Airbase is the better fit

If you run a smaller number of projects at a time and your team already knows which orders are tied to which job, Airbase's faster onboarding and simpler approval chains reduce the administrative load on a lean project management team. It works well when your biggest procurement risk is approval delay, not commitment tracking, and when most of your spend flows through a manageable number of equipment distributors and subcontractors rather than dozens of specialty vendors per project.

When Procurify earns the extra setup

If you're running several EPC projects concurrently with different interconnection timelines, or if your finance team needs to report committed-but-unbilled spend by project to lenders or investors, Procurify's PO-centric workflow does more of that work for you. The tradeoff is more setup time up front: someone has to build out your project cost structure inside the tool so that a module order actually maps to the right job and cost code, rather than landing in a general equipment category.

The switch order and reroute problem

A slipped interconnection date sometimes means reroute the order to a different project that's ready sooner, not cancel it. Neither tool automates that decision, but Procurify makes it easier to see, at the PO level, exactly what's committed and where, so a project manager can propose the reroute with real numbers instead of a phone call to the warehouse. Build this into your process deliberately: designate someone who reviews open POs against project schedules at least monthly, since equipment sitting unassigned in a yard is the most common way capital gets stuck.

Change orders and utility-driven scope changes

Utility interconnection requirements change mid-project more often in this industry than in general construction, and a change order that adds switchgear or protection equipment needs its own approval path, separate from your original budget. Set up a distinct approval tier for change orders above a threshold you define, routed to whoever owns project profitability, not just whoever approves routine purchasing. This keeps a utility-mandated scope change from quietly eroding margin before anyone notices.

What the finance team actually needs to see monthly

For an EPC firm juggling several projects, the monthly review that matters most isn't total spend, it's committed spend by project compared against the current schedule. Build a report, whichever tool you choose, that shows open purchase orders next to each project's latest interconnection date, so a schedule slip surfaces as a cash question immediately instead of showing up as a surprise when the invoice finally arrives months later.

A monthly finance review should show these items side by side:

  • Open purchase orders listed next to each project's latest interconnection date, so a schedule slip surfaces as a cash question right away.
  • Committed-but-unbilled spend by project, especially if lenders or investors ask for it.
  • Equipment already ordered and sitting in the laydown yard while it waits on interconnection.
  • Change orders above your approval threshold, with the person who owns project profitability named as the approver.
  • Slipped orders that could be rerouted to a project that is ready sooner, backed by purchase-order numbers.

Subcontractor payments deserve their own workflow

Electrical and civil subcontractors on a solar build typically bill against a schedule of values tied to project milestones, not a flat invoice like an equipment distributor sends. Neither Airbase nor Procurify is a construction draw management system, so if you're managing retainage or milestone-based subcontractor billing, keep that process in a dedicated tool or spreadsheet and use your procure-to-pay platform for the equipment and materials side, where a purchase order model fits more naturally. Trying to force milestone billing into a generic bill-pay workflow usually creates more reconciliation work than it saves.

Executive Capability Standard

What Good Looks Like

Good procurement for a solar or energy EPC firm means every major equipment order is visible as committed spend against a specific project and schedule, not just an approved bill after the fact.

Building The Capability (5-Stage Skill Ladder)

1. Learn:Understand the difference between development-stage, procurement-stage, and construction-stage costs on your projects, since each carries different risk if the schedule slips.
2. Do Manually:Keep a simple tracker of open equipment orders against each project's interconnection timeline, reviewed monthly by whoever owns project delivery.
3. Delegate:Assign a project controller or operations lead to own the reroute decision when a project's timeline slips and equipment needs to move to a different job.
4. Automate:Build project and cost-code tagging into your purchase order workflow so committed spend is visible by project without manual reconciliation.
5. Buy:Have Frank, MeetMyCFO's AI CFO, review your committed-spend reporting against project schedules to flag capital sitting idle before it becomes a cash problem.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Which tool is better for tracking equipment that's ordered but sitting in a laydown yard waiting on interconnection?

Procurify's purchase order structure gives you clearer visibility into committed-but-not-yet-billed spend, which matters most when equipment sits between order and installation for an extended period. Airbase can track it too, but you'll rely more on manual project tagging than on the PO workflow itself.

Can either platform handle prevailing wage or labor compliance tracking?

No, neither is built for labor compliance. That belongs in a payroll or construction management system. Use Airbase or Procurify for materials and subcontractor purchasing, and keep labor compliance in a dedicated tool or process.

How should we route a utility-mandated change order?

Set a distinct approval path for change orders above a dollar threshold you choose, sent to whoever owns project margin rather than routine purchasing approvers. This keeps interconnection-driven scope changes from eroding profitability before someone reviews them.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.