Financial Audit Management & Pre-IPO Compliance3 min readUpdated September 2026

Comparing FloQast and AuditBoard for an IT Consulting Firm

An IT consulting or managed services firm runs two revenue streams through the same close: flat monthly retainers for managed services, and project or ticket-based billing that swings month to month.

Auditors care about both, and the two systems you're weighing solve different pieces of the problem underneath that mix.

Vendors Covered in this Article

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

What Each Tool Actually Compares To

FloQast isn't a competitor to your PSA or ticketing system, it's a layer on top of your close that standardizes how reconciliations get prepared and reviewed. AuditBoard isn't a substitute for a security compliance report, it's where a compliance owner documents and tests the financial controls a SOX audit or a demanding enterprise client's due diligence team will ask about.

Comparing them on features misses the point: the real tradeoff is which gap in your close and controls process is costing you more right now.

The Managed Services Retainer Reconciliation Problem

Recurring retainer revenue looks simple until a client adds seats mid-contract, cancels a service line, or triggers an overage. Reconciling billed retainer revenue against the active contract list every month is exactly the repeatable, high-volume check close management software is built for, and it's usually the first place a growing MSP's close breaks down as the client count climbs past what one person can track from memory.

The Subcontractor Pass-Through Problem

Firms that route specialized work through subcontractors, whether that's a security specialist for a compliance project or overflow help desk coverage, carry a second reconciliation: subcontractor billing against client invoicing, plus the tax documentation for every contractor in that chain.

That documentation gap is what auditors, and separately the IRS, both care about, and it's worth solving with dedicated contractor tax tooling rather than trying to bolt it onto either audit platform.

Weighing the Tradeoff for a Multi-Client Shop

If your last audit finding was about inconsistent retainer reconciliation or missing reviewer sign-off, that's a close discipline gap, and close management software addresses it directly without needing a dedicated compliance hire.

If the finding was about undocumented general IT controls, no formal change management testing, or no risk control matrix covering client environments, that's a framework gap a GRC platform is built to organize. Most MSPs don't need both on day one; they need whichever one matches this year's actual finding.

A Reasonable Sequence If Budget Is Tight

Fix retainer and project reconciliation discipline first if your close is still manual, since that's usually cheaper to implement and shows results within one close cycle. Add a formal control-testing platform once you have an enterprise client, an investor, or a cyber insurer asking for documented, tested controls rather than a described process.

If you want to see where a broader GRC suite fits once you outgrow either point tool, our FloQast, AuditBoard and Workiva comparison covers that next step.

Keep these checks separate in every close:

  • Tie billed managed services retainer revenue to the contract list as its own reconciliation line.
  • Tie project or ticket-based billing to milestones or hours as a separate line, so a reviewer can catch errors specific to each revenue type.
  • Track subcontractor pass-through costs and keep tax documentation under finance ownership, with the handoff built into subcontractor onboarding.
  • Test a mid-contract client downgrade to confirm revenue and the retainer reconciliation update correctly.

A Worked Example: A Client Downgrade Mid-Contract

Picture an MSP with a large managed-services roster, one client of which downgrades from a premium security tier to a basic monitoring tier a few weeks into a new quarter. The billing system prorates the change automatically, but the reconciliation that ties billed revenue to the active contract list doesn't catch it unless someone updates that client's line in the contract list the same week, not at month end after the invoice already went out.

Multiply that by a handful of similar changes across a growing client base every month, upgrades, downgrades, added seats, a client that churns mid-cycle, and the contract list a reconciliation depends on can drift from reality fast if updating it isn't built into the change process itself. The fix isn't reconciling more often, it's tying the contract list update to whatever system triggers the billing change in the first place, so the two never fall out of sync.

Once that discipline exists, the reconciliation itself is straightforward: total billed retainer revenue for the month should tie to the sum of every active contract's rate, adjusted for the specific days a mid-month change was in effect. Anything that doesn't tie needs a documented explanation before the books close, not a note to look into it later.

For the access and change management side, the same principle applies to who can modify a client's environment or billing tier. If an account manager can both approve a client's tier change and adjust the billing record without a second reviewer, that's exactly the kind of segregation-of-duties gap a GRC platform is built to test for, once your controls are mature enough to formalize. Most MSPs get more value fixing the reconciliation discipline first, though, since that's the gap showing up in the numbers every month, not just at audit time.

Executive Capability Standard

What Good Looks Like

An IT consulting or MSP close is in good shape when retainer billing ties to the active contract list every month, subcontractor invoices reconcile against client billing, and general IT controls are documented and tested on a set cadence, not reconstructed when a client or auditor asks.

Building The Capability (5-Stage Skill Ladder)

1. Learn:List every active managed services contract with its current seat count and service tier, then compare that list against what actually got billed last month.
2. Do Manually:Write a one-page description of your change management process for client environments, since that's usually the first general IT control an auditor tests.
3. Delegate:Give one operations or finance lead ownership of the retainer reconciliation and subcontractor tie-out every close, instead of splitting it across account managers.
4. Automate:Deploy FloQast to standardize the retainer and subcontractor reconciliations, then add AuditBoard once a client or auditor needs documented, tested IT controls.
5. Buy:Bring in a contractor tax compliance service to validate subcontractor tax documentation before an auditor samples that population.

How to Get Started

Disclosure: We may earn a commission if you buy through some links on this page. It doesn't change what we recommend.

Frequently Asked Questions

Do we need both security compliance and SOX controls, or just one?

They serve different audiences. Security compliance work reassures clients about your operational controls; SOX 404 applies once you're a public company (with a phase-in for newly public companies) and covers financial reporting controls specifically. An MSP with private clients usually only needs the former, unless it's pursuing its own audit or acquisition.

Can close software handle both retainer and project revenue in one reconciliation?

It can host both, but they're still separate checks: one ties billed retainer revenue to the contract list, the other ties project billing to milestones or hours. Keep them as distinct reconciliation lines so a reviewer can catch errors specific to each revenue type.

Who should own subcontractor tax documentation, finance or operations?

Finance should own it, even though operations usually onboards the subcontractor, because finance is the function that faces penalties and auditor sampling if tax documentation is missing or mismatched. Build the handoff into your subcontractor onboarding checklist so it doesn't fall through.

About the numbers

This guide doesn't quote a sourced benchmark. Figures in it are estimates or general guidance, so check them against your own numbers.

Related Guides